Prepare vertical PV lighting inputs before comparing project options.

Use this checklist when discussing a vertical photovoltaic format for an off-grid lighting project. Prepare the site, load and interface details so you can request information for a named configuration.

Give every proposed format the same input pack.

A project can compare options fairly only when the site, operating task and approval boundaries are written down once and used consistently.

  1. Site geometry

    Provide plan, elevation where useful, clearances, nearby obstructions and access route.

  2. Solar context

    Record location, shading observations, surrounding structures and planned changes.

  3. Load and operation

    State connected loads, schedule, control expectations, criticality and permitted downtime.

  4. Interfaces

    Identify mounting, electrical connection, civil work and maintenance responsibilities.

Define the proposed configuration and required documents.

Exact identity

Record model, revision and configuration only when a candidate is actually identified.

Physical interface

Request the relevant drawing for mounting, access and third-party support review.

System context

Keep assumptions about loads, controls and storage interfaces visible to the project team.

Document scope

Request current files with their date, holder, named scope and destination relevance.

Compare energy, maintenance and installation requirements.

Request yield, lifetime, maintenance and output information for each proposed configuration, and confirm current availability. Compare the supporting evidence using the same site and operating assumptions.

Send the site and load details for a project proposal.

Include geometry, shading observations, operating context, mounting constraints, destination and the documents required for the project.

Tell us where the light has to work.

WhatsApp