Solar street-light quotation brief for your project.

Request a solar street-light shortlist with the road layout, mounting plan, operating periods and destination. Use the optional template below to prepare a project, wholesale-range or OEM enquiry.

Edit a brief you can send.

Fill in what you know, leave unknowns visible, or replace the template with a short question. Every field is optional. Review the draft before sending and attach plans or photos in your email or WhatsApp app.

Use your own requirements. Requested options, files and dates still need confirmation for the exact quotation.

Your entries stay in this page until you choose a draft or copy. They are not saved by this website. The draft includes this guide and your first-touch source. Prefer a shorter message? Use the quick enquiry.

Send the geometry that affects the decision.

Attach a plan, marked photographs and the installation boundaries. Identify the route, pole or mounting positions, intersections, entrances, obstructions, access paths and parties who control each interface.

  1. Location and layout

    Mark the road, parking or public-area limits, existing structures and proposed positions.

  2. Task and operation

    Describe the intended activity, operating schedule, control expectations and any critical periods.

  3. Solar context

    Record shading observations, nearby changes, site orientation and the information the project team can verify.

  4. Ownership

    Name who reviews drawings, civil works, electrical interfaces, local requirements and final acceptance.

Build a clear road-lighting brief.

Include the site, intended operation, proposed configuration, destination and required documents. Leave a field blank if it does not apply.

Project identity

Project name, destination, drawing revision, site contact and requested decision date.

Proposed scope

Family, exact model if known, configuration description and mounting context; do not substitute a family name for an identity.

Required documents

Name the drawing, current document or written clarification needed for the quoted configuration and destination.

Decisions before order

Assign every missing value, local rule, interface and approval to the responsible party and next action.

Quotation responses against your road-lighting requirements.

Confirm the selected model and current availability, then compare the response against your project record. Request configuration-specific evidence for the required site outcome and destination acceptance.

Send the marked plan and open-question list.

A short site record, intended use, proposed mounting context, destination and evidence questions create a better starting point than an assumed specification.

A project decision

Configuration, site conditions and destination requirements remain project decisions.

Tell us where the light has to work.

WhatsApp